Application
Province | Customer Name |
Shanxi | Yangquan Coal Industry Group: First Mine, Second Mine, Third Mine, Fifth Mine, Xinyuan, Xinjing, Xindadi, Pingshu, Kaiyuan, Hongxia First Construction, Yunyu, Taichang, Sijiazhuang, Changgou, Huozhou Coal Power, Fenxi Zijin Coal Industry, Jiexiu Zhengyi Mine, Changzhi Xiangyuan, Jincheng Dongfeng Coal Mine, Taiyuan Xiyu, Yu County Xingyu Mine, Yu County Dongping Mine, Lu'an Wuyang Mine |
Ningxia | Hongliu Mine of Ningxia Coal Group |
Shaanxi | Shaanxi Hengyi and Shaanxi Huangling Mine |
Gansu | Lanzhou Agan Coal Industry, Gansu Huating, Gansu Yaojie |
Shandong | Huaheng Coal Industry of Shandong Energy Group |
Anhui | Lan County Changheng of Wanbei Coal Industry, Huainan Mining |
Heilongjiang | Shuangyashan Coal Mine Bureau |
Henan | Zhengzhou Coal Industry (Group) Co., Ltd. |
Electromagnetic wire of the electromagnetic wire
1. Jincheng Dongfeng Coal Mine
Field data:
Project | Specific Situation |
Using Unit | Shaanxi Hengyi |
Installation Site | Boiler Room ZSCB10-800/10 |
Installation Time | 2012.5 |
Operation Period | 49 months |
Specification and Model of the Electromagnetic Wire | SBEMB 4*5.75 |
2.First Mine of Yangquan Coal Industry Group
Field Data:
Project | Specific Situation |
Using Unit | First Mine of Yangquan Coal Industry Group |
Installation Site | No.1 Mine SZ11-16000/35 |
Installation Time | 2013.7 |
Operation Period | 28 months |
Specification and Model of the Electromagnetic Wire | ZB-0.45 2.12*12.5 ZB-0.45 3*6.7 ZB-0.45 2.65*5.6 |
3. Hongliu Mine of Ningxia Coal Group
Field Operation Data
Project | Specific Situation |
Using Unit | Hongliu Mine of Ningxia Coal Group |
Installation Site | Main Ventilator ZSG-750-10 |
Installation Time | 2014.7 |
Operation Period | 28 months |
Specification and Model of the Electromagnetic Wire | ZB-0.3 3.55*7.1 |
4. Leasing Branch of Jizhong Energy Fengfeng Group Co., Ltd.
Field Operation Data
Project | Specific Situation |
Using Unit | Leasing Branch of Jizhong Energy Fengfeng Group Co., Ltd. |
Installation Site | Hydroelectric Power Office ZSG-750-10 |
Installation Time | 2014.7 |
Operation Period | 22 months |
Specification and Model of the Electromagnetic Wire | ZB-0.3 3.55*7.1 |
©1996-2023 晉ICP備07500050號(hào) Huaxin Copyright
©1996-2023 晉ICP備07500050號(hào) Huaxin Copyright