亚洲国产综合无码一区_国产a毛片精品日日夜_免费看Av中文字幕在线_自拍日本乱伦中文_国产精品成人黄色视频_五月天丁香六月婷婷网_会员免费体验区亚洲天堂_亚洲欧美性另类春色_少妇被又粗又硬猛烈进出小说_免费看h黄动漫网站网址

Hello, welcome to Huaxin
Electromagnetic wire series

Electromagnetic wire series

Application

 

Province

Customer name

Shanxi

Yangquan Coal Industry Group: First Mine, Second Mine, Third Mine, Fifth Mine, Xinyuan, Xinjing, Xindadi, Pingshu, Kaiyuan, Hongxia First Construction, Yunyu, Taichang, Sijiazhuang, Changgou, Huozhou Coal Power, Fenxi Zijin Coal Industry, Jiexiu Zhengyi Mine, Changzhi Xiangyuan, Jincheng Dongfeng Coal Mine, Taiyuan Xiyu, Yu County Xingyu Mine, Yu County Dongping Mine, Lu'an Wuyang Mine

Ningxia

Hongliu Mine of Ningxia Coal Group

Shaanxi

Shaanxi Hengyi and Shaanxi Huangling Mine

Gansu

Lanzhou Agan Coal Industry, Gansu Huating, Gansu Yaojie

Shandong

Huaheng Coal Industry of Shandong Energy Group

Anhui

Lan County Changheng of Wanbei Coal Industry, Huainan Mining

Heilongjiang

Shuangyashan Coal Mine Bureau

Henan

Zhengzhou Coal Industry (Group) Co., Ltd.

Electromagnetic wire of the electromagnetic wire

1. Jincheng Dongfeng Coal Mine

 

Field data:

Project

Specific situation

Using unit

Shaanxi Hengyi

Installation site

Boiler room ZSCB10-800/10

Installation time

2012.5

Operation period

49 months

 Specification and model of the electromagnetic wire

 SBEMB  4*5.75

2.First Mine of Yangquan Coal Industry Group

Field data:

Project

Specific situation

Using unit

First Mine of Yangquan Coal Industry Group

Installation site

No.1 Mine SZ11-16000/35

Installation time

2013.7

Operation period

28 months

  Specification and model of the electromagnetic wire

   ZB-0.45 2.12*12.5

   ZB-0.45 3*6.7

   ZB-0.45 2.65*5.6

3. Hongliu Mine of Ningxia Coal Group

Field operation data

Project

Specific situation

Using unit

Hongliu Mine of Ningxia Coal Group

Installation site

Main ventilator ZSG-750-10

Installation time

2014.7

Operation period

28 months

  Specification and model of the electromagnetic wire

   ZB-0.3 3.55*7.1   

4. Leasing Branch of Jizhong Energy Fengfeng Group Co., Ltd.

Field operation data

Project

Specific situation

Using unit

Leasing Branch of Jizhong Energy Fengfeng Group Co., Ltd.

Installation site

Hydroelectric Power Office ZSG-750-10

Installation time

2014.7

Operation period

22 months

  Specification and model of the electromagnetic wire

   ZB-0.3 3.55*7.1   

Contact information

Submit your inquiry

Your local Huaxin Sales Team

  • NameKai Wang
  • Address26254 Prima Way Santa Clarita,CA 91350
  • PhoneChina:15234310529,US:+1 9095606525
  • FaxChina:+86 (0)353-4909788
Close
Submit your inquiry

Your local Huaxin Service Team

  • NameKai Wang
  • Address26254 Prima Way Santa Clarita,CA 91350
  • PhoneChina:15234310529,US:+1 9095606525
  • FaxChina:+86 (0)353-4909788
Close
Submit your inquiry

Your local Huaxin Cooperation Team

  • NameKai Wang
  • Address26254 Prima Way Santa Clarita,CA 91350
  • PhoneChina:15234310529,US:+1 9095606525
  • FaxChina:+86 (0)353-4909788
Close

©1996-2017 晉ICP備07500050號 Huaxin Copyright 

©2016-2017 晉ICP備07500050號 Huaxin Copyright