亚洲国产综合无码一区_国产a毛片精品日日夜_免费看Av中文字幕在线_自拍日本乱伦中文_国产精品成人黄色视频_五月天丁香六月婷婷网_会员免费体验区亚洲天堂_亚洲欧美性另类春色_少妇被又粗又硬猛烈进出小说_免费看h黄动漫网站网址

Hello, welcome to Huaxin
Electric locomotive series

Explosion-proof and intrinsically safe charger for mining

1. The technical approach of the charger is non-controllable rectification technology, which is realized by adopting the super high power inverter technology. The key technology refers to high-power power electronics technology and embedding control technology. Compared with the traditional charger, it has small volume, light weight, high efficiency, intelligence and rich protection functions. Protection of the intelligent charging mode on the battery is also greatly improved.

2. The product is applicable for charging the battery of various electrical locomotive for mining and other equipment of 15t and below with charging voltage less than 300V and charging current less than 100A.

  • 1. Rated input voltage: 660VAC/380VAC±10% three-phase 50HZ

    2. DC output current: 10-100A

    3. DC output voltage: 20V-350V

    4. Working mode: initial charging mode and quick mode

    5. It has the self-inspection function

    6 .It has overcurrent, overload, short circuit and overtemperature (60℃) protectionfunctions.

  • Compared with the traditional charger, it has small volume, light weight, high efficiency, intelligence and rich protection functions. Protection of the intelligent charging mode on the battery is also greatly improved.

  • For overall diagram see (Figure 1)

    The square shell structure is adopted for the charger which has small volume and light weight, so as to facilitate movement and repair. It consists of two explosion-proof chambers.

    1 The main explosion-proof chamber is installed with IGBG, rectifier bridge, transformer, main control board and other electrical components, and the heat pipe is adopted for natural cooling.

    2 The display screen and three function keys are installed on the front door.

    3 The wiring chamber is at the upper part, there are four horns at the left and right in total, and there are two compression nuts in the front for secondary line to pass in and out.

Contact information

Submit your inquiry
Close
Submit your inquiry
Close
Submit your inquiry
Close

©1996-2017 晉ICP備07500050號(hào) Huaxin Copyright 

©2016-2017 晉ICP備07500050號(hào) Huaxin Copyright